IT Solutions Provider


Network Drops Addition - Infrastructure
Cabling

The Challenge

Lyncean Technologies, in Fremont, required 20 new additional network drops (16 news and 4 relocations to be exact). They needed this quickly and reached out to Accend Networks.

Our Solution

After receiving the inquiry and requirements from Robert Lai, the IT Manager, Accend quickly started working on providing a quote based on the floor plan and new network drops required. We quickly provided a quote with breakdown of equipment needed (network cables, wall plates, CAT6 RJ-45 jacks..etc) and the total cost for labor, the quote was approved.

The Results

By Monday and through the next two weeks (time was needed to run the cables and for some healing time needed for a concrete area that needed to be cured), Lyncean had all 20 CAT6A ethernet drops run, labeled, and documented. Robert was a happy camper and mentioned he will continue to use our service for other work needed.